The entry to the sub division on State Rd A1A. |
|
|
|
Community Club House and pool |
|
|
|
January 2007
It's 1,700 square feet and here's a generic floor plan. We've added a covered porch off the rear of the kitchen, a fire place in the living room, and an extended garage. |
|
|
|
February 2007
Thrilling, I know. That is a dirt lot, and the eventual location of the new castle. |
|
|
|
March 10, 2007
The permits have been pulled and the foot print of the foundation is in place. |
|
|
|
March 18, 2007
Dirt inside the form. Not much, but it is progress... |
|
|
|
....and from the back |
|
|
|
|
April 7, 2007
The plumbing is in the ground. |
|
|
|
Another view of the plumbing. |
|
|
|
April 9, 2007
Moisture barrier and rebar in place, time to pour the foundation and slab. |
|
|
|
April 14, 2007
The slab has been poured. |
|
|
|
.....and from the back |
|
|
|
April 21, 2007
Frame is up and sheathing is on. |
|
|
|
The lovely and gracious Kellie inspecting the work. |
|
|
|
|
.....and from the back. |
|
|
|
April 25, 2007
Framing completed |
|
|
|
from the back... |
|
|
|
April 28, 2007
The roof installed |
|
|
|
The A.C. ducting installed |
|
|
|
.....and from the back |
|
|
|
May 6, 2007
Front door installed and getting ready to shingle. |
|
|
|
|
Bath tub installed and rough wiring done. |
|
|
|
another view of the interior wiring. |
|
|
|
May 12, 2007
Vapor barrier, windows, and the shingling complete. |
|
|
|
Fire place installed |
|
|
|
and from the back... |
|
|
|
May 18, 2007
Not much progress this week. Just a sliding glass door installed. |
|
|
|
May 23, 2007
The drywall is ready to install. |
|
|
|
|
June 2, 2007
Ready for stucko as soon as tropical storm Barry blows out of town. |
|
|
|
The living room drywalled |
|
|
|
Another view looking towards the kitchen and spare rooms. |
|
|
|
The front door. |
|
|
|
View from the master bedroom. |
|
|
|
And from the back... |
|
|
|
June 6, 2007
Textured ceilings are done. |
|
|
|
|
June 10, 2007
Stucko is done |
|
|
|
Trim work is done and doors being hung. |
|
|
|
From the back. |
|
|
|
June 13, 2007
The exterior painting has started. |
|
|
|
Cabinets and countertops installed. All the doors are hung, the wall texture and painting is complete. |
|
|
|
The master bath. |
|
|
|
And from the back... |
|
|
|
|
June 16, 2007
The flooring going in. |
|
|
|
June 20, 2007
The forms for the driveway and sidewalks are in. |
|
|
|
A.C. airhandler installed. |
|
|
|
External A.C. unit installed. |
|
|
|
June 28, 2007
The drive way and side walks are done. |
|
|
|
The tile around the fire place is done. |
|
|
|
The shelves are in all the closets. |
|
|
|
|
Mirrors, medicine cabinets, towel racks, and crap paper holders are in place. |
|
|
|
July 5, 2007
The landscaping and exterior lighting is done. |
|
|
|
The mantle is in progress |
|
|
|
The finish electrical work and plumbing is done. |
|
|
|
The dishwasher and stove are in place. |
|
|
|
And from the back. |
|
|
|
July 11, 2007
The paint job is almost done and the address is attached. |
|
|
|
|
July 17, 2007
Finished paint job. |
|
|
|
The carpet is finally installed. |
|
|
|
Back yard with fence, construction is complete. |
|
|
|
Been in the house about two months now. The unpacking is done and Kellie has just about completed the decorating. Here's the living room. |
|
|
|
The kitchen |
|
|
|
The hall way |
|
|
|
The ankle biter's room. |
|
|
|
|
The ankle biter's bathroom. |
|
|
|
The master bath. |
|
|
|
The master bedroom. |
|
|